
DC feeder cable from Sun-Pull’s Solar Wire Management Solutions is the answer to maximizing installation efficiencies on large-scale solar farms. Pre-cut, pre-labeled DC cable is custom configured with the project lengths and breakouts that exactly match your job specs. Factory-built DC feeder cable ensures that when your crew is ready for installation, the cable is on-site, ready to install
The Sun-Pull Advantage
Sun-Pull’s Solar Wire Management Solutions maximize labor productivity and accelerate job completion. Our full-service wire management process optimizes project workflow from start to handoff.

Know Before
Expert analysis and planning identifies problems ahead of time.

Reduce Labor Costs
Pre-built DC feeder cable reduces field work.

Eliminate Delivery Delays
Sun-Pull’s industry-best lead times keep jobs moving forward.

Finish Faster
Factory labeled, paralleled, and terminated DC cable speeds installation.

FASTEST LEAD TIMES
IN THE INDUSTRY
REDUCTION IN INSTALLATION COSTS AND COMPLETION TIMES
PROJECTS
DELIVERED ON TIME
GUARANTEED
IF IT’S WRONG, WE’LL FIX IT